چکیده :

Increasing demand for containerization compels container terminals to improve their performance. Uncoordinated scheduling of operations is one of the main factors accounting for poor performance at automated container terminals (ACTs). To increase land utilization efficiency and lower operational times, a new storage system called the split-platform automated storage/retrieval system (SP-AS/RS) has been introduced for temporary storage of containers. This paper describes a multi-objective mixed-integer programming (MIP) model that is based on a combination of multiple interacting sub-tasks. It is aimed at optimizing the integrated scheduling of handling and storage operations in ACTs. The MIP model objective function is to minimize delays in the loading/unloading tasks of the cranes and the travel time of vehicles and platforms in the SP-AS/RS. At the same time, a simulated annealing algorithm (SAA) that provides near-optimal solutions for the problem in a reasonable computation time is appraised. The results of this study show that the objective function of the MIP model is, on average, 58 % lower than that of the non-integrated scheduling method. On the other hand, the best objective function values obtained by the SAA indicate only a 3.7 % disadvantage in comparison with optimal values determined by the MIP model, demonstrating that the SAA is able to provide near-optimal solutions for the integrated scheduling of handling and storage operations.

کلید واژگان :

Mixed-integer programming . Simulated annealing algorithm. Integrated scheduling .Quay cranes .Automated guided vehicles . Split-platformautomated storage/ retrieval system



ارزش ریالی : 600000 ریال
دریافت مقاله
با پرداخت الکترونیک